Why Stopping 103,154 Vehicles/Day for 4 Cars/Minute Causes 1.5-Mile A13 Queues

At Renwick Road, a solid central barrier already bans all right turns and an existing pedestrian underpass eliminates all ground-level north–south crossings. Yet fixed traffic lights stop 3 lanes of the A13 Westbound every cycle to serve a light left-merging side road.

103,154 A13 veh/day (DfT CP 99902, 2025)
2,642 Renwick Rd veh/day (DfT CP 811184, ~4 cars/min NB)
ZERO Opposing turns or at-grade pedestrian crossings
−85% → 0m A13 WB queue (MOVA re-timing vs Merge Lane)

Interactive Pre / Post Junction Simulation

Switch between the current fixed signals, an immediate zero-concrete MOVA re-timing, and removing the lights with a DMRB CD 122 merge lane.

Playback:
Free flow (>35 mph) Slow (15–35 mph) Jammed (<15 mph) HGV / Bus Sim: 0.0s

Verified Eclipse SUMO 1.28 Pre / Post Results (30-Minute Peak)

Identical demand calibrated to official UK DfT manual counts: 4,200 veh/hr A13 WB (CP 99902, 2025) + 240 veh/hr Renwick Rd NB (CP 811184 + growth) + 220 veh/hr left-in.

DfT 2025 + SUMO 1.28
Scenario A13 WB Mean Speed A13 WB Time Loss A13 WB Max Queue Renwick Mean Wait Renwick Max Queue Total Delay (30m) CO2 (30m) Outcome
1. Baseline: Fixed Signals 37.3 mph 45.4 s 257.5 m 22.1 s 26.8 m 24.43 veh-hr 2,104 kg A13 Tailback
2. A13-Priority Actuated (MOVA) 43.7 mph 18.4 s 39.1 m 42.5 s 33.5 m 11.57 veh-hr 2,045 kg −85% A13 Queue
3. No Signals + Merge Lane 45.4 mph 12.7 s 0.0 m 0.0 s 0.0 m 7.01 veh-hr 1,990 kg −71% Delay · Free-Flow

1. Zero Pedestrian or Turn Conflict

The solid central barrier already bans all right turns across the A13, and a grade-separated pedestrian underpass already carries north–south foot traffic beneath the carriageway from Legacy Forest / Krithia Road. There is zero ground-level pedestrian crossing across the A13 here.

2. Physical Space (UK DMRB CD 122)

On a 50 mph urban dual carriageway, a DMRB CD 122 Type A taper merge requires ~115–130 m (40 m nose + 75 m taper) at 3.25–3.5 m width. A ~3.5–4.5 m verge strip runs west past Lt Kebabai & DT Trucks; narrowing the 3 A13 lanes to standard 3.25 m Red Route width frees another 1.2 m inside existing tarmac.

3. Immediate & Funded Path for TfL

TfL owns the A13 Red Route and its signals. Step 1 (A13-priority MOVA) requires zero civil works and cuts A13 queueing by 85% immediately. Step 2 (signal removal + merge lane) can be assessed using Barking Riverside's earmarked Section 106 Renwick Road junction funding (£1.9m).